🇬🇭 REPUBLIC OF GHANA –

Gold Mining Project

Ghana mining map

OVERVIEW

  • Country: Republic of Ghana
  • Project Status: Completed
  • Start Year: 2011
  • Minerals: Gold (Placer / Alluvial)
  • Mining Type: Alluvial (Placer Deposits)
  • Technology:
    DOVE EXPLORER® Modular Gold Processing Plant – 150 TPH capacity
    ♦ Fully mechanized multi-stage recovery system with water recycling, zero chemical usage

PROJECT DESCRIPTION

In 2011, DOVE Minerals, in association with TEMA Nordic Co., successfully implemented a large-scale alluvial gold mining operation in Ghana.

The project targeted rich placer (alluvial) gold deposits, and to achieve this, DOVE designed, supplied, and commissioned a customized EXPLORER® modular gold processing plant with a capacity of 150 tons per hour (TPH).

This plant was the first of its kind within the concession, marking a significant milestone in Ghana’s mining industry by replacing artisanal practices with a modern, professional, and sustainable gold recovery system.

Mining Operations & Technology

Mining Operations & Technology

The Ghana gold processing plant was configured with DOVE’s proven multi-stage gravity recovery system, engineered for maximum efficiency in alluvial environments while ensuring environmental compliance.

 

DOVE processing plant in Ghana

Key Features:

Large bulk feed hopper for direct feeding by dump trucks

✅ Equipped with high-pressure hydraulic cannons to disintegrate ore and form slurry

✅ Trommel classifier for size separation and clay treatment

✅ Primary and secondary jig concentrators for gravity recovery of coarse and fine gold

✅ VBS® Concentrators and Shaking Tables for final cleanup of ultra-fine gold particles

✅ Closed-loop water recycling system to minimize consumption and environmental impact

✅ Eco-friendly design – 100% recycled water, no toxic chemicals.

DOVE gold processing plant in Ghana

This robust system allowed for continuous high-capacity operation at 150 TPH, ensuring maximum recovery with zero gold loss, while maintaining full compliance with Ghana’s mining and environmental standards.

Contribution to Ghana’s Mining Sector

The DOVE–TEMA Nordic Co. partnership delivered several key achievements:

  • Introduced professional-scale mechanized gold recovery in the concession
  • Significantly increased recovery yields compared to artisanal methods
  • Established a model for environmentally responsible gold mining in West Africa
  • Reinforced Ghana’s role as one of the world’s leading gold producers
DOVE Ghana Gold Mining Project

Legacy

The Ghana project stands as a landmark achievement in DOVE’s portfolio of global mining projects. It demonstrated DOVE’s ability to deliver state-of-the-art recovery technology in one of Africa’s most competitive mining regions.

It also set a new benchmark for sustainable alluvial gold mining in West Africa, proving that high productivity and environmental stewardship can successfully go hand in hand.

DOVE GHANA PROJECT PHOTO GALLERY

DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Ghana Gold Mining Project
DOVE Minerals Ghana Gold Mining Project
DOVE Minerals Ghana Gold Mining Project
DOVE Minerals Ghana Gold Mining Project
DOVE Minerals Ghana Gold Mining Project